All posts by Andrea Irey

Ronald Reagan Washington National Airport (DCA) Runway 04-22 Overlay & Taxiway Rehabilitation, Arlington, VA

Berner Construction was awarded a contract from Lagan US Inc. to support the restoration of runways, taxiways, aprons, shoulders, and intermediate areas related to Runway 04-22 at the Ronald Reagan Washington National Airport.  Berner’s scope includes:  excavation and disposal of existing runway subbase aggregate; pavement shoulder adjustment; placement of geogrid for subgrade stabilization; placement of soil stabilization (geotextile) fabric; placement and compaction of crushed aggregate subbase and base course.  Additionally, Berner is responsible for the erosion and sedimentation control measures, storm water pollution prevention, dewatering, and vegetative restoration of the disturbed areas.

Overnight Taxiway Repair

Saturday Taxiway Closure

P209 Placement




Wallops Airfield Repair Project CoF Phase 1 at the Wallops Flight Facility, Wallops Island, VA

Berner Construction was awarded a contract from Lagan US Inc. to support the restoration of runways, taxiways, aprons, shoulders, and intermediate areas at the Wallops Airfield Repair Project at the Wallops Flight Facility.  Berner’s scope includes  excavation and removal of concrete slabs in areas of existing drainage; excavation and removal of the existing storm water system; furnish and install new reinforced concrete piping (RCP); furnish and install new concrete manholes and inlet structures; backfill and compact suitable soils in pipe trenches and structure excavations.

Berner has also been tasked with repairs to the facilities cast iron water lines.

New Storm Water Line Installation

Storm Water Line Excavation

Storm Water Line Installation

Cast Iron Water Line Repair