Fort Indiantown Gap Landfill

Location: Annville, Lebanon County, PA

How We Helped:

Provide labor, materials, equipment, and supervision to remediate an existing landfill/dump site

  Click to Enlarge
FITG june 2016

FITG june 2016

FITG july 2015

FITG july 2015


Project Overview:

Berner Construction, Inc. (Berner) was contracted by Weston Solutions, Inc. landfill remediation of the existing landfill at Fort Indiantown Gap in Annville, PA.

The primary objective of the Remediation Project was to eliminate the public health and safety hazards that existed by containing the landfill source using a soil cover at the site.  The goals of the source area containment remedy included the consolidation of waste into a centrally located landfill area; elimination of the exposed waste surface along the unnamed creek; and grading the consolidated waste surface to accommodate construction of a soil cover over the waste for future recreational use.

The scope of work for this project included the following:  clearing and grubbing; implementation of erosion and sediment control measures; construction of sedimentation basin and sediment trap, stripping and stockpiling topsoil, excavation and relocation of waste, import and placement of structural and vegetative fill, reconstruction of the creek channel and embankments, construction of access roads and trails, and site restoration.